![]() |
|
#1
|
|||
|
|||
|
If I send in a new 85805 dist. with bronze gear is there a charge to installed the new gear and get the dist. locked out. What is the normal lead time to have this done?
Thanks |
|
#2
|
||||
|
||||
|
usually 5 to 10 working days ( the faster you get it here -the faster we can turn it around)
|
|
#3
|
|||
|
|||
|
Is there a charge was this service? Do I have to call first before sending this in, if I do the number to call and you I ask for please.
Why don't you offer this dist. with the bronze gear installed and the timing locked out see that this a common set up? Thanks |
|
#4
|
||||
|
||||
|
Quote:
Quote:
|
![]() |
| Bookmarks |
| Thread Tools | |
|
|